FFP13
System302 / Foundation Fieldbus Project Implementation

This training course shows how to implement a Foundation Fieldbus Project using Smar System302. Covering scope of supply, documentation needed, project schedules and costumer delivery documentation. Factory and Site Acceptance Tests (FAT/SAT) procedures are also covered during the training sessions.

The attendee will be able to:

  • Program project meetings and discussions
  • Understand the documentation needed to start a System302 project
  • Understand Foundation Fieldbus project execution steps
  • Understand the documentation generated during a Foundation Fieldbus project implementation
  • Understand FAT and SAT implementations
  • Implement a real Foundation Fieldbus Project using Smar System302 Solution

Topics:

  • Analysis and Scope Definitions
  • Project Schedule
  • Kick-Off Meetings - Considerations and Definitions
    -System Reliability
    - System Performance
    - System Architecture
  • Project Documentation
    - I/O List
    - P&ID - Piping & Instrumentation Diagram
    - Instrument List
    - Loop List
    - Instrument Layout
    - Loop Description
  • Configuration Definitions
    - Channel Assignment
    - I/O Assignment
    - Detailed System Architecture
  • Panel Project
    - Document Specification
    - Generated Panel Documentation
  • Configuration Design
    - H1 and HSE Level Installation Aspects
    - Intrinsic Safety Application
    - 4-20mA/HART, Foundation Fieldbus and Logic Configuration (Syscon and LogicView)
    - Foundation Fieldbus Network Control Performance
    - HMI OPC Configuration (ProcessView)
  • Documentation
    - ILD (Instrumentation Loop Diagram)
    - Network Drawings
    - Strategy Control Documentation
  • System General Tests
    - Test Protocol
    - Tests Timing Duration
    - Necessary Documentation
    - Generated Documentation
    - Customer Documentation
  • FAT - Factory Acceptance Test
    - FAT Test Plan Additions
    - FAT Procedures
    - Test Schedule
    - Typical Problems
  • SAT - Site Acceptance Test
    - SAT Test Plan Additions
    - Definitions
    - Procedures
  • Project Implementation Development
    - Implementing an Foundation Fieldbus project using Smar System302 Solution.

Pre-requisite:
It is mandatory to have attended the FFP04, FFP06, FFP07, FFP09 and FFP10 training courses.

Program Length:
32 hours (4 working days)